Ot-systems FT410DBE User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 17
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
FT410DBE Series Installation & Operation Manual
www.ot-systems.com 7
(3) Installation
3.1 General
All OT Systems products are thoroughly inspected, tested and securely packaged before
delivery to ensure a stable, intact and trouble-free service. Please check the equipment upon
receipt for any visible damage which may have been caused during shipping.
The FT410DBE Series standalone units (Fig. 3.1) can be either horizontally or vertically
wall-mounted, or mounted on any fixture. The Standalone unit works with an external power
supply FT-PA/12V powered by local 110/220V power.
The FT410DBE Series card modules are housed inside the FT-C18 rack-mount chassis (Fig.
3.2) with an included power supply unit. The whole chassis is powered by local 110/220V power.
FT-C18 is a standard 19(483mm) rack-mount chassis which occupies 4 rack units (177.8mm) in
height. Each FT410DE card module occupies two slots and a total of 9 cards can be housed
inside the chassis.
3.2 Standalone unit installation
a) Mount the standalone unit onto a fixture, (either on the wall or on a flat surface) with four
screws through the holes on the mounting frame to secure it in position.
b) The provided power supply should also be mounted on the same fixture or in the proximity
for connection of the supply cables to the unit, provided that an AC power supply socket is
nearby for powering the adaptor.
c) Connect all the signal inputs and outputs at the back of the unit with appropriate cables:
fiber optic cable for optical link, BNC cable for video input/output (Tx/Rx), UTP cable for data
input/output (Tx/Rx) and Ethernet cables for the Ethernet network or the Ethernet equipment
connections.
d) Once the unit is powered up, check that the red POWER LED on the unit is lit. If not, check
the power supply cable connections between the unit and the power supply socket.
e) With all the signals available at the input and output ports, check the status of LEDs located
on the unit. With correct status of each LED, installation is now completed [for LEDs status, see
Operational Guides on this manual’s section (5)].
Fig. 3.1 Standalone unit
Fig. 3.2 FT-C18 chassis
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 16 17

Comments to this Manuals

No comments